How Much Fall Does a Flat Roof Need?

You might not notice that small puddle on a flat roof in the morning after a wet day. But in the winter months that little puddle can start to cause some serious problems. As it freezes and thaws, its weight also pushes down on the deck below, so it holds more and more each time. Eventually it finds a weakness in the waterproof covering on top.

Typically the cause of water pooling on a flat roof is not the GRP or EPDM covering but the fall of the deck itself.

Quick answer: Most flat roofs need a minimum finished fall of 1:80 (12.5mm per metre). Under BS 6229:2025, a roof under 50m² should generally be designed to a fall of at least 1:60, with a steeper fall such as 1:40 used where deflection or detailing may reduce the finished drainage performance.

Before you start

We've assumed a fairly typical job:

  • You are covering a timber joist roof to a garage, extension, dormer or shed.
  • The covering will be a GRP roofing kit or an EPDM roofing kit.
  • You know where the water is to run off your roof (e.g. to the guttering at the low eaves or out through a wall).

What is a flat roof drainage gradient?

"Fall" and "drainage gradient" are terms that are often used to describe the roof's drop to the gutter or outlet. This is usually written as a ratio, e.g. 1:80 (1mm fall for every 80mm run).

How much fall does a flat roof need?

BS 6229:2025 and the NHBC Standards provide guidance for roof drainage. The minimum finished fall for most conventional flat roofs is 1:80 (12.5mm/m). The required design fall depends on the structure, deflection, construction tolerances and drainage layout. For smaller roofs, a minimum design fall of 1:60 may apply under BS 6229:2025; 1:40 remains a possible steeper design example and is also shown in NHBC guidance for certain membrane and liquid-applied systems.

The difference between the designed and finished fall allows for movement, construction tolerances and deck deflection. Do not assume that designing at one ratio guarantees another on the finished roof: the actual roof must still drain correctly without backfalls.

Diagram of a 4m flat garage roof with a 100mm fall from the house wall to the gutter

Do Building Regulations set a minimum fall?

Not as a number. Part H of the Building Regulations only says that rainwater must be adequately carried away from the roof. The 1:80, 1:60 and 1:40 figures come from BS 6229:2025 and the NHBC Standards.

Flat roof fall table

Roof length Minimum finished fall (1:80) Design example (1:60) Design example (1:40)
2m 25mm 34mm 50mm
3m 38mm 50mm 75mm
4m 50mm 67mm 100mm
5m 63mm 84mm 125mm
6m 75mm 100mm 150mm

Figures show the total drop over a straight roof run, rounded up to the nearest millimetre. The 1:60 and 1:40 gradients are design examples, not universal requirements. Follow the gradient specified for your roof.

How to work out the fall for your roof

Measure down from the high side to the low side of the roof, along the way the water will run, and multiply this length in metres by 25mm.

For a simple example consider a single garage with a roof that runs 4m from the house wall down to the gutter. 4 x 25mm = 100mm, so the deck height at the house wall must be 100mm above the deck height at the other (gutter) end of the garage.

Lay a 1m straight edge down on the deck (running in the direction of the fall) and put a spirit level on top. Lift the low end until the bubble sits in the middle, then measure the gap underneath. Around 25mm means the fall is right, and anything under 12.5mm is too flat.

Which way should a flat roof fall?

Away from the house, and away from any wall that the roof meets.

The low edge is typically protected by a drip trim, which allows water to fall down into the gutter. The other open edges are protected by a raised edge trim, which keeps water on the roof and steers it towards the drip. Our Roof Edge Trims Guide explains which is best to use where.

On roofs where parapet walls surround the edges, the fall runs down to a through-wall outlet at the lowest point of the parapet wall.

The 'valley' between two slopes will be flatter than either individual slope. Here, an increased fall is required. Additionally, water tends to amass on the uphill side of rooflights and upstands.

How to create the fall

The slope has to be built into the structure itself. Resin, topcoat and adhesive add nothing to it, and flat sheets of insulation just follow the slope of the deck.

When building from new, the simplest way to achieve a fall is to construct the joists so that one end is fixed lower than the other.

Tapered firrings can also provide fall on level joists. We stock treated timber firring strips in two lengths: 3.6m and 4.8m. Check the taper before you order, as it should give at least 25mm of fall per metre over your roof.

A warm roof can also have a fall created using tapered insulation. This is cut to the required slope and laid down on a level deck.

Illustrative roof construction showing how tapered timber firrings can form a fall. Dimensions shown are examples, not a specification for Apex firring strips or a structural design.

Troubleshooting flat roof fall problems

Why does water sit along the house wall?

The roof has a 'back fall', which means that rather than running away from the house wall, it runs towards it. It can be put right with firrings or by re-setting the joists before the new covering goes on.

Why is there a puddle in the middle of the roof?

The deck may be sagging between the joists. Check the joists are the right size and spacing for the span. Additional noggins should be fixed underneath the ends of the boarding that are not already supported, and any boards that have gone soft should be replaced.

Why does water pool around an outlet?

Is it blocked? Has it been set too high? First clear out any debris, and if the water still doesn't flow, reset it slightly below the roof surface.

Plan the fall before you order